Center for Adventist Research | Photograph Database | Whole Photograph Collection | b1800 | b18218635_k0001

Andrews University Pioneer Memorial Church (Construction)

Download Full Resolution Image

Image Information:
Title:Andrews University Pioneer Memorial Church (Construction)
Description:Dale Howell (right) explains themechanism of a unit in the newly installed temperature control system at Pioneer Memorial Church on the Andrews University campus to John Kriley (left)l manager of AU's physical plant, and Pastor John Kroncke of PMC. Howell was in charge of installation of the $50,000 system, which will go into operation for church services this weekend. Similar systems using water for heating and air conditioning have recently been installed in several other university buildings; all are connected by water mains to a central unit at the science complex where thew ater temperature is controlled
Created:195-
Artist:Fred Galusha Photographic Specialties Berrien Spring
Physical Desc:1 photograph : black and white ; 17 x 12 cm
Physical Reference:P 011345

Keywords:

Citation: Fred Galusha Photographic Specialties Berrien Spring 195-. Andrews University Pioneer Memorial Church (Construction). Database on-line. Center for Adventist Research Image Database. http://centerforadventistresearch.org/photos (accessed May 18, 2024).

©2014 Center for Adventist Research. Publication is not restricted. The Center requests the courtesy of a credit line.

No Comments

Add a comment:

Code

*Required fields



Archive View | Powered by zenPHOTO